Latest Pakistani Jobs

National Highway Authority NHA Jobs May 2023

S# Name of
Posts
with BS Total No.
of Posts Prescribed on Qualification Experience Age Limit Projects No. of posts
In each
project   1 Deputy Director (Eng r) BS-1 8 33 3 B. Sc (Civil) 07 years in
the relevant
field 40 Construction of Athmuqam -Sharda-Kel -Taobat Road Section (109.2 km) including two tunnels at Kahori/ Kamser (3.7 km) and Challpani (0.6) Section of Neelum Valley Road. AJ&K Deposit Work 04   Dualization of Khuzdar — Kuchlak Section of National Highway (N-25) 330KM 05 M. Sc (Civil) 04 years in
the relevant
field 40
(Relaxable
by 3 years) Construction of Rajanpur-DG Khan as a 4-lane Highway (ADD) 03   D.G. Khan — D.I. Khan (ACW) (N-55) – 208.19 Kits (CAREC Corridor. ADB) 04   Dualization & Improvement of Existing N-50 from Yank – Sagu -Zhob including Zhob Bypass (210 km) 02 Ph. D (Civil) 02 years in
the relevant
field 40
(Relaxable
by 5 years) Khyber Pass Economic Corridor Project (Revised) (World Bank) 06   Dualization and Rehabilitation of Karachi – Kararo (232 kms) & Wadh – Khuzdar (41 Kms) (Total Length 273 kms) – N-25 02   Dualization and Rehabilitation of Kararo – Wadh (83 kms) & Kuchlak – Chaman (104 Kms) (Total Length 187 kms) – NI-25 05   Rehabilitation & Upgradation of Pezu-Tank Road (38 Km) 01   Dualization of Rawalpindi-Kahuta Road including 4-Lane Brdige over Sihala Railway Pass. Sihala Bypass & Kahuta Bypass 01   3 Deputy Director (LM & IS) BS-18 01 LLM 10 Years in
the relevant
field 40
(Relaxable
by 2 years) Construction of Additional Carnage way Shikarpur-Rajanpur Section of N-55 CAREC Corridor (ADB) 01   LLB 10 Years in relevant field 40   Assistant Director (Engineer) BS-17 33 B.SC Civil 1″ Class or M.SC in Relevant Subject Nil 35 Construction of Athmuqam -Sharda-Kel -Taobat Road Section (109.2 km) including two tunnels at Kahori/ Kamser (3.7 km) and Challpani (0.6) Section of Neelum Valley Road. AJ&K Deposit Work 04   Construction of Chitral — Garam Chashma Road Project (82.5 km) 02   Construction of Rajanpur-DG Khan as a 4-lane Highway (ADB) 02   D.G. Khan — D.I. Khan (ACW) (N-55) – 208.19 kms (CAREC Corridor. ADS) 02   Dualization & Improvement of Existing N-50 from Yank – Sagu -Zhob including Zhob Bypass (210 km) 02   Dualization of Khuzdar — Kuchlak Section of National Highway (N-25) 330KM 05   Khyber Pass Economic Corridor Project (Revised) (World Bank) 07   Dualization and Rehabilitation of Karachi – Kararo (232 kms) & Wadh – Khuzdar (41 Kms) (Total Length 273 krns)- N-25 02   Rehabilitation & Upgradation of Pezu-Tank Road (38 Km) 01   Dualization of Rawalpindi-Kahuta Road including 4-Lane Brdige over Sihala Railway Pass. Sihala Bypass & Kahuta Bypass 01   Dualization and Rehabilitation of Kararo – Wadh (83 kms) & Kuchlak – Chaman (104 Kms) (Total Length 187 kms) N-25 05   4 Assistant Director (LM & IS) BS-17 03 LLB Nil 35 D.G. Khan — D.I. Khan (ACW) (N-55) – 208.19 kms (CAREC Corridor. ADB) 01   Khyber Pass Economic Corridor Project (Revised) (World Bank) 01   Dualization of Rawalpindi-Kahuta Road including 4-Lane Brdige over Sihala Railway Pass, Sihala Bypass & Kahuta Bypass 01   5 Qanoongo BS-9 10 Matric with
Patwar/
Tapedar
Course 10 years in
the relevant
field 25 Construction of Additional Carriage way Shikarpur-Rajanpur Section of N-55 CAREC Corridor (ADB) 02   Construction of Athmuqam -Sharda-Kel – Taobat Road Section (109.2 km) including two tunnels at Ka hon/ Kamser (3.7 km) and Challpani (0.6) Section of Neelum Valley Road, AJ&K Deposit Work 02   Construction of Rajanpur-DG Khan as a 4-lane Highway (ADS) 01   D.G. Khan — D.I. Khan (ACW) (N-55) – 208.19 kms (CAREC Corridor. ADB) 01   Khyber Pass Economic Corridor Project (Revised) (World Bank) 01   Dualization and Rehabilitation of Karachi – Kararo (232 kms) & Wadh – Khuzdar (41 Kms) (Total Length 273 kms) – N-25 01   Dualization of Rawalpindi-Kahuta Road including 4-Lane Brdige over Sihala Railway Pass, Sihala Bypass & Kahuta Bypass 02   6 Patwari BS-5 16 Matric with     Nil Patwar/
Tapedar
Course 25 Construction of Additional Carriage way Shikarpur-Rajanpur Section of N-55 CAREC Corridor (ADB) 02   Construction of Athmuqam -Sharda-Kel – Taobat Road Section (109.2 km) including two tunnels at Ka hori/ Kamser (3.7 km) and Challpani (0.6) Section of Neelum Valley Road, AJ&K Deposit Work 02   Construction of Chitral — Garam Chashma Road Project (82.5 krn) 02   Construction of Rajanpur-DG Khan as a 4-lane Highway (ADB) 01   D.G. Khan — D.I. Khan (ACW) (N-55) – 208.19 kms (CAREC Corridor, ADB) 01   Khyber Pass Economic Corridor Project (Revised) (World Bank) 01   Dualization and Rehabilitation of Karachi – Kararo (232 knis) & Wadh – Khuzdar (41 Kms) (Total Length 273 krns)- N-25 01   Dualization of Rawalpindi-Kahuta Road including 4-Lane Brdige over Sihala Railway Pass, Sihala Bypass & Kahuta Bypass 06  

Source link